Who we are
Why Choose Us
We are Nigerias first choice and preferred professional custom pool builders. We deliver right the first time and give the best poolscape warranty in the industry This is what sets us apart from other swimming pool companies
The cost of repairing a leaking or defective or failed pool is almost equal to the cost of building a new pool. Our professional services save our customers such needless hassles and we deliver you a leakproof pool built right the first time
Whether you need a commercial or residential construction or other visual appeal enhancing features and accessories like spas, renovation, equipment/chemical supply, maintenance and installations, fountains, waterfalls, safety covers, safety nets, perimeter fencing, poolbeds, slides, LED and fiber optics lightings, overhead canopies, gazebos,we are equipped and happy to meet your needs, and exceed your expectations.
For questions or proposal, please call us at 234 805 966 5527, or e-mail us at care@swimmingpoolBoss .com.ng to schedule an appointment
Our Pool Construction Process
For over 25 years, we at swimmingpoolBoss been perfecting our construction process to provide the most efficient and easy pool building experience around. Our Pool Construction Process page explains step by step and from start to finish what to expect when you are having a swimming pool built . As a swimmingpolBoss customer, you’ll never be in the dark about what’s going on in your backyard. By providing regular communications throughout every phase, we keep you informed about what’s to come. Please take few minutes to familiarize yourself with the stages of the pool construction process
SETTING OUT
After the design of the pool is agreed with the client, we set out your pool and layout the pool shape and dimension on the ground. This gives the client an idea of how the pool will fit into the available space and be sure of the location and position before excavation works commences
EXCAVATION
This is the digging of the hole in the ground to the size and dimension of the pool shape drawn and sett out above. Excavation work can be done manually or with an excavator depending on how accessible or restrictive the pool site is located
BLINDING
After the ground excavation to the shape, size and dimension of the pool, the ground surface is leveled and hand trimmed to receive the sandcrete or concrete blinding
FLOOR IRONWORKS/PLUMBING/EQUIPMENT
The reinforcement ironworks for the pool floor is laid on the set/hardened blinding above. The plumbing fittings and equipment for the pool floor are laid/installed/embedded within the floor ironworks
WATERPROOF CONCRETE FLOOR
The pool concrete floor is cast with the mixture of sharp sand, cement, waterproof additives and granite chipping in the right mix ratio and consistence. A poker vibrator is also used at this stage to eliminate trapped air void within the wet concrete mix in order to ensure proper hardening and avoid honeycomb leakages
WALLFORM WORK
The reinforcement ironworks from the pool floor above is continued and completed to form the pool wall ironworks. Thereafter the carpentary formwork is set up perimeter round to form the pool wall at both the near and far faces. Again the plumbing fittings and equipment for the pool wall are laid, installed/embedded within the wall ironworks and carpentary formwork
WATERPROOF CONCRETE WALL
This process is carried out same way as the waterproof concrete floor above. The pool concrete floor and wall now forms the pool shell
BACKFILLING THE POOL SHELL
The walkway around a swimming pool is called the terrace. After the backfilling and compaction of the terrace soil, reinforcement iron are laid in terrace, as well as plumbing and electrical fitting. The terrace is afterwards cast in concrete
TERRACE CASTING
The walkway around a swimming pool is called the terrace. After the backfilling and compaction of the terrace soil, reinforcement iron are laid in terrace, as well as plumbing and electrical fitting. The terrace is afterwards cast in concrete
PLANT ROOM INSTALLATION
All plumbing pipes and electrical pipes/wiring are terminated in the plant room where the pump and filter that control the functioning of the pool are installed, located and housed
TILLING
The pool is now ready for the tiling of the interior and the terrace
COMMISSIONING
Finally the pool is ready for use. It is washed with acid, the surround are cleaned up, excess excavated materials and debris are carted away from site. The pool is filled with water and chemically treated to now receive swimmer. The entire environment is now transformed into extraordinary retreat of fun and enjoyment
Our No Nonesense Warranty
SwimmingpoolBoss not only provides the first of its kind, standard swimming pool industry warranty against leakages, defects and failures that guarantees the pool concrete shell for the lifetime of the pool, but our warranty also covers the tile and coping for the first year as well. In addition, we provide a three-year equipment warranty on all pumps, filters, plumbing and electrical installations